Manajemen Pembangunan Pada Developer Perumahan (Britania Cilegon)
Keywords:
Building Maintenance, Construction Supervision, Housing Developer, S-curve, Quality ControlAbstract
The development of cluster housing requires integrated management involving civil engineering aspects, construction quality control, project management, cost efficiency, time scheduling, and post-construction maintenance. This colloquium study discusses engineering practices in the Britania Cilegon Housing Project developed by PT. MAS Group, focusing on the construction of Phase I consisting of 160 housing units of type 40 and type 51 out of the total planned area of 535 plots. The methods applied in this study included field observations, project document analysis, technical coordination with the developer and contractors, and engineering evaluation of construction implementation and building maintenance processes. The results indicate that land procurement and site preparation were generally carried out effectively; however, the land elevation, which was relatively close to the river level, required stricter supervision of fill work and drainage systems. Housing designs were prepared internally by the developer, while construction activities were divided based on block zones, house types, and Work Order Letters (SPK). Several major issues identified during construction included inconsistencies in work quality among contractors, violations of construction procedures, project delays caused by inefficient allocation of contractor resources, and defects found in roof structures, wall finishes, and wet areas. Control measures were implemented through quality checklists, progress monitoring using bar charts and S-curves, corrective instructions, and penalties in the form of budget deductions when repairs were conducted directly by the developer. This engineering practice demonstrates that successful housing development is strongly influenced by consistent supervision, sustainable design innovation, environmental awareness, and commitment to maintaining residential quality.
References
Christopher, J., & Waty, M. (2021). Identifikasi faktor penyebab cost overrun (pembengkakan biaya) pada proyek rumah tinggal. JMTS: Jurnal Mitra Teknik Sipil, 4(3), 839–850. https://doi.org/10.24912/jmts.v0i0.12502
Indrasari, F. (2021). Gated community, cluster, sistem keamanan 24 jam: Menelusuri bentuk perumahan dari sisi pengembang. Jurnal Permukiman, 16(2), 69–81. https://doi.org/10.31815/jp.2021.16.69-81
Irmawati, S. (2021). Manajemen risiko pada proyek dengan sistem kontrak lumpsum. Jurnal Poli-Teknologi, 20(1), 15–26. https://doi.org/10.32722/pt.v20i1.2933
Jayanti, W. E., Meilinda, E., & Fitriana, K. (2021). Implementasi model prototype dalam rancang bangun sistem informasi manajemen proyek (SAMAR) berbasis web bagi perusahaan kontraktor. Jurnal Informatika Kaputama (JIK), 5(1), 19–27. https://doi.org/10.59697/jik.v5i1.291
Kencana, J. A., & Waty, M. (2021). Penerapan metode value engineering dalam pemilihan jenis beton pada proyek konstruksi perumahan. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 97–108. https://doi.org/10.24912/jmts.v0i0.10408
Muka, I. W., & Wibowo, M. A. (2021). Penerapan manajemen risiko pada proses pengembangan properti. Jurnal Permukiman, 16(1), 31–40. https://doi.org/10.31815/jp.2021.16.31-40
Pangestu, N. F., Az Zahra, A. F., & Sutrisno. (2021). Penerapan metode Critical Path Method (CPM) dalam proyek pembangunan jembatan Alun-Alun Kota Kuningan. Journal of Industrial and Manufacture Engineering, 5(2), 79–86. https://doi.org/10.31289/jime.v5i2.4925
Putri, W. A., Irwan, I., & Ardan, M. (2021). Analisis sistem informasi penjadwalan waktu dan pengendalian proyek gedung perkantoran dan gudang Suzuya. Journal of Civil Engineering Building and Transportation, 5(1), 37–45. https://doi.org/10.31289/jcebt.v5i1.5070
Soetjipto, J. W., Qudsy, N. H., & Arifin, S. (2021). Analisis risiko keterlambatan proyek menggunakan metode House of Risk. Journal of Applied Civil Engineering and Infrastructure Technology, 2(1), 1–10. https://doi.org/10.52158/jaceit.v2i1.149
Widodo, S. (2022). Analisis penjadwalan proyek dengan metode Line of Balance pada proyek pembangunan perumahan Grand Efata Malibela. Jurnal Teknik Sipil: Rancang Bangun, 8(1), 1–9. https://doi.org/10.33506/rb.v8i1.1736
Yusri, Y., & Wibowo, Y. (2023). Analisa dampak penerapan manajemen proyek dan efektifitas pekerja terhadap keberhasilan penyelesaian proyek pada pembangunan perumahan bersubsidi Pesona Prima 7 Rajamandala Developer PT. Kreasi Prima Nusantara. Jurnal Ilmiah Global Education, 4(3), 1520–1528. https://doi.org/10.55681/jige.v4i3.940
Arifin, M., & Nugroho, A. (2022). Analisis pengendalian mutu pekerjaan konstruksi pada proyek pembangunan perumahan. Jurnal Teknik Sipil dan Lingkungan, 7(2), 112–121.
Hidayat, R., & Prasetyo, B. (2022). Evaluasi penerapan keselamatan dan kesehatan kerja pada proyek pembangunan perumahan subsidi. Jurnal Rekayasa Sipil, 18(1), 55–64. https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1280
Saputra, D., & Lestari, F. (2023). Analisis manajemen waktu dan biaya pada proyek pembangunan rumah tinggal menggunakan metode Earned Value. Jurnal Konstruksia, 14(2), 145–154. https://jurnal.umj.ac.id/index.php/konstruksia/article/view/16124
Wijaya, A., & Firmansyah, D. (2022). Pengendalian kualitas pekerjaan struktur pada proyek pembangunan kawasan perumahan. Jurnal Talenta Sipil, 5(2), 88–97. https://talentasipil.unbari.ac.id/index.php/TS/article/view/214
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.






