Analisis Pengaruh Jumlah Jam Orang (Man Hour) terhadap Tingkat Produktivitas Galangan Kapal di Surabaya
DOI:
https://doi.org/10.58192/ocean.v2i3.1184Abstract
In a shipbuilding industry, fast and efficient time is needed in carrying out construction projects and ship repairs. This is because it has been mutually agreed between the two parties, both the owner of the ship (owner), and the shipyard regarding the time to work on the project. By racing on the processing time, the level of productivity is an important point that must be considered by the shipyard. There are many factors that can affect the level of productivity of a shipyard. One of the factors, among others, is the determination of the number of man hours (man hours). In a ship building or repair project, the allocation of the number of man hours is very important, if the number of man hours (man hours) is not correct it will cause delays and decrease in productivity levels. The purpose of this study was to analyze the effect of man hours on the level of productivity in the KMP repair project. Cakalang and KMP. Gili Iyang by conducting a correlation test of the Product Moment method with the help of SPSS (Statistical Program for Social Science) v2.3 for windows software, with the independent variable (X), namely the number of man hours (man hours) and the dependent variable (Y), namely the level of productivity. And then a significant correlation value is generated between the number of man hours (man hours) and the level of shipyard productivity. The results of this study are the significance values obtained between the X and Y variables in the KMP repair project. Cakalang is 0.037 and at KMP. Gili Iyang is 0.026 which means that there is a significant correlation between the variable man hours and productivity with a very strong relationship category in KMP. Cakalang and strong links to KMP. Gili Iyang.
References
Ananta, M.I.F., 2022, Estimasi Kebutuhan Material dan Jam Orang Pada Pembangunan Kapal Catamaran 9 M (FRP) di CV. Javanese Boat Indonesia, Laporan Hasil Tugas Akhir, Politeknik Perkapalan Negeri Surabaya.
Andreasson, E.R., 1980, Managing Ship Production, Course Notes, University of Strathclyde, Glasgow.
Bruce, G.J., 2006, A Review of The Use of Compensated Grass Tonnes For Shipbuilding Performance Measurement, Journal of Ship Production.
Firgananto, J., D., Basuki, M., dan Margareta, M., Z., B.,, 2019, Peningkatan Produktifitas Dan Kapasitas Produksi Galangan Kapal Tradisional Paciran Lamongan Sebagai Industri Kapal Nasional, Prosiding Seminakel, hal 1-10
Handoko, T.H., 2011, Manajemen Personalia dan Sumber Daya Manusia, Penerbit BPFE, Yogyakarta.
Intifadha, R.G., Analisa Perhitungan Produktivitas dan Jam Orang Pada Kegiatan Repair Kapal KMP Nusa Wangi I di PT Galangan Pelni Surya, Laporan Hasil Tugas Akhir, Politeknik Perkapalan Negeri Surabaya
Kurniawan, D., A., Basuki, M, dan Soejitno, 2017, Optimalisasi Penggunaan Dock Space Pada Pekerjaan Reparasi Kapal Di PT. Dok Dan Perkapalan Surabaya (Persero) Dengan Metode PERT (Program Evaluation Amd Review Technique), Prosiding Seminar Nasional Sains dan Teknologi Terapan V.
Mas Nabilah WK, Basuki, M., dan Pranatal, E., 2018, Analisa Biaya Dan Waktu Project Crashing Pada Pembangunan Kapal Baru (Studi Kasus Pemmbangunan Kapal Cargo Ro-Pax 300 Di PT. Adiluhung Sarana Segara Indonesia), Prosiding Seminar Nasional Sains dan Teknologi Terapan, hal 101-108.
Nurhali, Crhismianto, D., dan Hadi, E.S., 2016, Pengukuran Produktivitas Galangan Dalam Pembangunan Kapal Perintis 1200 GT, Jurnal Teknik Perkapalan, Volume 4, No. 4, Oktober 2016, Fakultas Teknik, Universitas Diponegoro.
Panjaitan, M., 2017, Pengaruh Lingkungan Kerja Terhadap Produktivitas Kerja Karyawan, Jurnal Manajemen, Volume 3, No. 2, Juli – Desember 2017, Fakultas Ekonomi, Universitas Methodist Indonesia.
Primosvila, R.R., 2014, Studi Produktivitas Galangan Kapal Dalam Pembangunan Kapal Dengan Metode Compensated Gross Tonnage, Seminar Hasil Skripsi, Program Studi Teknik Perkapalan, Fakultas Teknik, Universitas Pembangunan Nasional “Veteran” Jakarta
Saputra, R.S.A., 2019, Estimasi Kebutuhan Material dan Jam Orang Pada Pemasangan Lambung Kapal TB. Harmony VII Blok I di PT. Kukar Mandiri Shipyard, Laporan Hasil Tugas Akhir, Politeknik Perkapalan Negeri Surabaya.
Sujarweni, W.V., 2012, Statistika Untuk Penelitian, Penerbit Graha Ilmu, Yogyakarta.
Suyuti, A.M., dan Basuki, M., 2022, Analisis Perbandingan Penjadwalan Proyek Dengan Critical Path Methode (CPM) Dan Critical Chain Project Management (CCPM) Pada Reparasi Kapal BG. KFT 8005, Prosiding SENASTITAN: Seminar Nasional Teknologi Industri Berkelanjutan, Vol 2, hal 152-165.