Penilaian Risiko Operasional Pada Pembuatan Perahu Fiberglass Di Galangan Kapal Cv Era Fiberboat Menggunakan Metode Matrik Risiko Dan Fmea

Authors

  • Cesar Ivan Nugraha Institut Teknologi Adhi Tama Surabaya
  • Minto Basuki Institut Teknologi Adhi Tama Surabaya

DOI:

https://doi.org/10.58192/ocean.v2i2.1147

Keywords:

Perahu Fiberglass, Metode matriks risiko, FMEA

Abstract

The purpose of this study is to analyze the safety operational process in fiberglass shipbuilding, identify the types of risk causes that hinder the construction of fiberglass boats and propose recommended actions needed to overcome the risks in CV ERA FIBERBOAT by using theoretical research methods. Identification of risks in the process of building new ships, namely employees, materials, work equipment, payment of construction costs, working drawings have revisions. Determining the risk rating of the new ship building process: very high; inappropriate equipment, height; late payment / paying, medium; working drawings have revisions, low; materials arrive late, very low; employees procrastinate. Mitigating risks in the process of building new ships: employees delay work with mitigation, namely the director of the company provides the opportunity for employees to rest so that employees do not get sick, materials arriving late are mitigated by means of shipyard companies providing an easy-to-find address point so that the sender of materials does not having difficulty finding the address of the shipyard, working drawings have revisions that can be mitigated by means the company must always make an existence to the customer in every work process so that there is no miscommunication

References

Adiguna., P., Juniani., A., I., dan Nugroho., A., (2017), Teknik Identifikasi Bahaya Dan Pengendalian Resiko Pada Panggung Gas Osigen PT Aneka Gas Industri V, Prosidang Seminar K3, 1(1), 77–81.

Basuki, M., dan S. Widjaja., (2008), Studi Pengembangan Model Manajemen Risiko Usaha Bangunan Baru pada Industri Galangan Kapal, J. Teknoin, Univ. Islam Indonesia., no. Januari, pp. 117-123.

Carlson., Carl., (2012), Effective FMEAs : Achieving Safe, Reliable, And Economical Products And Processes Using Failure Mode and Effect Analysis. Canada: United Stated Of America.

Firmansyah,M., I., dan Basuki, M., (2021), Risk Assessment K3 Pada Pekerjaan Bongkar Muat Di Dermaga Jamrud Surabaya Menggunakan Metode HIRAC Dan FMEA, Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN), Vol 3, no. 1, hal 372-382

Endraswara, D., Basuki, M., dan Kusuma, P.A.I, (2017), Penilaian Risiko Proses Bongkar Curah Kering Menggunakan Metode FMEA (Failure Mode And Effect Analysis) di PT. XYZ, Prosiding SNTEKPAN V, ITATS, hal D15-D20.

Ghozali, I., (2007), Manajemen Risiko Perbankan; Pendekatan Kuantitatif Value at Risk, Badan Penerbit Universitas Diponegoro, Semarang.

Hanafi., Mamduh., (2006), Manajemen Resiko. Yogyakarta: YKPN.

Mulcahy., R., (2010), Risk Management Tricks of the Trade for Project Managers (Second Edition). Chicago: RMC Publications Inc.

OCBC., (2021), Alasan Proses Manajemen Risiko Perusahaan Perlu Dilakukan.

Rana, A., Y., dan Basuki, M., (2022), Analisa Risiko Pembangunan Barge Mounted Power Plant (BMPP) 60 MW di PT. PAL Indonesia (Persero) Menggunakan Metode Failure Mode and Effect Analysis (FMEA) dan Matrik Risiko, Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN), Vol 1, No. 1, hal 476-492

Santosa., B., (2009), Manajemen Proyek Konsep & Implementasi, Yogyakarta: Graha Ilmu.

Sucipto., (2014), Keselamatan dan Kesehatan Kerja, Yogyakarta: Gosyen Publishing.

Sugiantara, K., dan Basuki, M., (2019), Identifikasi dan Mitigasi Risiko di Offshore Operation Facilities dengan Menggunakan Metode Failure Mode and Effect Analysis, Jurnal INTECH Teknik Industri Universitas Serang Raya, Vol 5, No. 2, hal 87-92

Yantono, D., dan Basuki, M., (2021), Penilaian Risiko K3 Pada Terminal Nilam-Mirah Surabaya Menggunakan Matrik Risiko Dan FMEA, Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN), Vol 3, no. 1, hal 361-365

Downloads

Published

2023-07-17

How to Cite

Cesar Ivan Nugraha, & Minto Basuki. (2023). Penilaian Risiko Operasional Pada Pembuatan Perahu Fiberglass Di Galangan Kapal Cv Era Fiberboat Menggunakan Metode Matrik Risiko Dan Fmea. Ocean Engineering : Jurnal Ilmu Teknik Dan Teknologi Maritim, 2(2), 87–96. https://doi.org/10.58192/ocean.v2i2.1147